Methods And Techniques Of Build Tents

- Apr 11, 2017 -

First decided to put up the place of the tent, in order, by 4 people work together, do not take much time, can be simple and set up. In order to consider the situation of tent withdrawal, the initial collocation of the situation, will be more convenient.

Tents have a variety of different types, at the same time, there are different production, collocation design and combination. Small tents, a font tent, wall tents due to the order of construction, the combination of the way, is to use cable erected "tent set up", but recently developed improved warhead and hut-type tents, is belonging to the "combination tent."

The following is one of the basic tents, which is a fairly popular wall-type tent For example, explaining the way the tent is erected.

1. Decision of the venue

After considering the wind and terrain, choose a flat land.

2. Inspection of tent Appliances

Pour out the items in the bag, and inspect the parts individually. In order to withdraw the tent when the convenience and do not omit things, should be recorded first.

3. Laying Ground mat

After the ground mat is paved, the four corners are fixed with a nail. If there is a lot of humidity, the mat is laid before it is placed.

4. Prop up, pull the main rope

The pillar beneath the holes in the surface mat at both ends, while at the top of the pillar, wearing the holes in the two pillars of the pillars of the cloth curtain, will pull the left and right main rope to avoid the left and right tilt. In this way, the main body of the tent is formed.

5. Adjusting the main rope, pulling the corner rope, waist rope

With a rope attached to the main rope, adjust the shape of the tent and stand the two pillars vertically on the ground. Secondly, adjusting the angle rope and waist rope with the rope to make the tent form appear.

6. Fixing walls

Connect the tent floor, floor mats and the bottom of the walls.

Above for wall-type tent erection order, four people division of labor, in the skilled state, about 10-15 minutes can be completed.

Usually, the roof cover will be added to reduce the effects of rain and sun exposure and freezing. In step 4, plug the pillar at the end of the hole, first with the roof cap, and then the main rope pulled, the main rope fixed with nails, the roof of the building of the vertex, the formation of the side of an equilateral triangle, the length of the bottom, pulling into equal lengths of pillars. From the top of the roof, the angular rope should be stretched diagonally, and the waist rope is in a straight line with the angular rope.

In the past, tents had been erected so that they could dig ditches around them. Now, stand in the protection of the natural position, unless in the water depressions, otherwise no longer dug ditches.

  • SKYGII Hard Top 4x4 Off-Road Roof Top Auto Tent
  • SKYGII Trailer Hardtop Roof Mounted Rtt Top Tent for Car Camping
  • SKYGII Rack for Car Roof Top Tent
  • SKYGII Triangle Hard Top Trailer Rooftop Car Camping Tent
  • SKYGII Truck Hard Shell Roof Top Tent With Wind Resistant Triangle Hydraumatic Waterproof ABS For 2 Persons
  • SKYGII Large Size Folded Truck Canvas Roof Top Tent Camping For Max 3 Persons

Related Products